Lot consisting of machinery and equipment for crushing inert such as Loro and Parisini vibrating screen and conveyors, OMT mill, cement silos, Ecosystem suction system, office furniture, containers and much more.
From the documentation section, download the Lot 1 and Lot 1.1 pdf files to view the complete list of goods included in this lot.
Sale in body and not to measure, some quantities may not correspond, an inspection on the spot is recommended.
To guarantee the correct and complete performance of the operations for the withdrawal of lot, or for the entire block, the successful tenderer will be required to pay a guarantee deposit of € 5.000 from pay no later than 5 days from the confirmation of the award to the coordinates that will be communicated at the same time as the confirmation of the award as a deposit for any days of delay and / or any damage that may be caused to the realestate during the withdrawal. This deposit will be returned at the end of the withdrawal operations if the times indicated are respected and if the realestate in the same state in wich was before the withdrawel