
Metal mezzanine
Prefabricated metal structure for mezzanine for warehouse use SALE NOTES The goods present above and below the structure are not part of this sale NOTES FOR COLLECTION maximum time for collection activities to take place from the agreed day 4 days Before dismantling the mezzanine it will be the responsibility of the successful tenderer to proceed with the grounding of the material located above it with costs at his expense Any damage during the moving phase will be borne by the successful tenderer Since part of the mezzanine is the covering of the office box located on the ground floor for its dismantling the successful tenderer will have to cut the support surface of the same bordering the box without causing damage to the latter Any damage during the dismantling phase will be borne by the successful tenderer