-It is specified that the buyer must sign, before completing the sale, a binding agreement regarding the repair: Consult the specific sales and collection conditions.
- we inform you that the collection of the goods is particularly difficult due to the location of the lots, it is therefore advisable to view them in order to evaluate the organization of the collection. It is specified that the costs and responsibility for the collection will be borne entirely by the successful tenderers of these lots even if it is necessary to dismantle structures and parts (such as, for example, walls made of insulating and soundproof panels and poroton blocks) in order to make collection possible. Following collection, it will in any case be the successful bidder's responsibility to restore the situation of the property to its previous state (with reassembly/reconstruction of any removed structures).
Auction carried out through an asynchronous sale procedure pursuant to art. 25 D.M. 32/2015
The offer will be considered valid following the payment of the deposit.
From the "How It Works" section, consult the "Guida Asta Asincrona" manual