Assembly Line for Evacuation Dryer (line_5)
COMPLETE ASSEMBLY SECTOR AS DRYERS
- OMG 77 roller shutter conveyor,
- Section with descender / Lift for corridor crossing
TESTING / REPAIR AND STATISTICAL CONTROL SECTOR
- Conveyor with friction rollers,
- N.6 electronic turrets for functional testing by AEA company,
- Station for statistical control year 1996
FINAL PACKAGING SECTOR
- Mixed conveyor with shutters and friction rollers,
- Base change equipment,
- N.1 equipment for OMS shrink wrapping (not working),
- N.2 equipment for applying OMS company straps (not working),
- Lifts / descenders plus underground transport for transferring the finished product to the storage warehouse.
The assembly line is equipped with the following accessories and tools for assembling the washing machine: about 20 screwdrivers, about 6 worktops, 1 belt and craft tools
(ref. Inventory 96).
NOTES FOR COLLECTION
- maximum time for collection activities to take place from the agreed day: 15 days